Navigation
Canary Wharf Station, London

Dornan was delighted to be appointed as an M&E contractor for such an innovative rail project. Canary Wharf Station on the new Crossrail network is 18m below water level, with five storeys of retail and office space above it, between...

Full details »
Ilford Yard, London

Ilford Yard provides stabling for Crossrail rolling stock along the North Eastern section of the network. Dornan was contracted to design and build the M&E for new operations and welfare facilities to service 60 new trains. Extraordinary solutions Full 3D...

Full details »
Heathrow Pier 7

Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7. Extraordinary solutions 43 prefabricated pipework and containment modules...

Full details »
Kent Station, Cork

As part of Iarnród Éireann’s preparations for the introduction of the much-publicised Mark 4 Trains to Ireland, a new service platform was built in Kent Station, adjacent to the existing maintenance facility. Dornan was awarded the mechanical services contract by...

Full details »
Pier D, Dublin Airport

Dornan has extensive experience of working in challenging live airport environments, Here our contract was to supply and install all the electrical services on the new Pier D and link bridge at Dublin Airport – a 19,000m2 area for arrivals...

Full details »
Cork Air Traffic Control Tower

The new control tower to the west of the main runway completes the refurbishment of Cork Airport. Dornan completed mechanical and electrical works on this complex project. Scope of work Lighting and lighting control Data/communications Power Leak detection system Window...

Full details »