Navigation

Heathrow Pier 7

Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7.

Extraordinary solutions

  • 43 prefabricated pipework and containment modules
  • Bespoke, prefabricated pump room
  • Hydrosphere flushing rigs to minimise water consumption

7 electrical distribution panels

17 air handling units

Prefabricated chilled water pump room