Dornan was commissioned to fit out a new three-storey manufacturing facility to increase capacity, connected to the existing warehouse at Level 1. This also involved installing new process utility generation equipment, and a new electrical substation in the existing production module.
13 AHUs with auxiliary equipment
16 process stainless steel exhaust systems