Project Description
The provision of a cGMP Commercial Production Biologics Facility to be built on its site. The facility shall be a multi-product manufacturing facility for the production of Mab-type bulk Drug substances under cGMP conditions with high operational efficiency.
The Project will consist of a new four story Production Building and utilities Building built within the existing operational plant.
Scope Of Works
The DEL scope includes the design, detailed drawings, procurement, supply, testing, packing, delivery, offloading, installation, re-assembly, pre-commissioning inspection and final commissioning of the HVAC system required for the UCB INFLEXIO project which includes but is not limited to the following equipment:
Air diffusion system containing ducting, flow control valves, diffusers etc.
HVAC field equipment such as reheating coils, chilled beams & fan coil units
Electrical cabinets and electrical connections of all HVAC equipment
Fume hoods & Fresh air intake plenums
Active Hydraulic Elements on AHU Manifolds
DCC Regulation and control devices
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland