


Project Description
The Tinbergen Building was opened in 1971 to house Oxford University’s Zoology and Experimental Psychology departments, and needed upgrading and extension to meet new research standards and to accommodate new laboratories for the Chemistry faculty. Dornan was appointed as an M&E contractor for this major project.
- Full 3D modelling and design validation
- Pre-fabricated elements of the infrastructure on M&E steel frame assemblies
- 300kW of heat recovery from the fume extract runaround coil system
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland