Project Description
Dornan was engaged to undertake the logistics management, installation, testing and commissioning of the full mechanical, sprinkler, electrical and telecoms packages in a 17.6MW greenfield data centre and administration block. We also carried out the complete fibre optic & copper cabling infrastructure. We initially completed a fully-coordinated BIM 3D model, allowing a seamless construction phase between all CSA and service elements within the building. This was complemented by a full offsite modular build which yielded significant cost savings.
- AHU installation
- Supply and extract ductwork
- Sprinkler design and installation
- VFR system
- Adiabatic and condensate pipework installation
- Trace heating network
- Domestic services installation
- MV & LV installation
- Service module installation
- MV/LV controls
- EPMS and BMS installation
- Bus-duct installation
- Telecoms
- Security
- Lighting and central battery emergency lighting infrastructure
- General services and power
- Fire alarm system
- Lightning protection
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland