Project Description
Wind power is making an increasingly important contribution to Ireland’s electricity production, and currently meets around 25% of the Republic’s electricity demand. Dornan has extensive experience in this sector, including installing the substation and switchyard at this 11-turbine farm in County Cork, with a combined installed capacity of 25MW.
- Civil design for substation and compound
- Electrical design for substation and compound
- Installation of 20KV & 38KV switchgear
- 30MVA transformer
- Controls and PCP panel
- LV switchgear, LV generator, lighting and power
- Fire alarm and intruder alarm
- Earthing
- Commissioning
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland