Heathrow Pier 7

blank_759_568
blank_759_568
blank_759_568
blank_759_568
blank_759_568

Project Description

 

Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7.

 

Scope Of Work
  • 7 electrical distribution panels
  • 17 air handling units
  • Prefabricated chilled water pump room
Extraordinary solutions
  • 43 prefabricated pipework and containment modules
  • Bespoke, prefabricated pump room
  • Hydrosphere flushing rigs to minimise water consumption

OUR OFFICES

Address Information

10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63

Contact Us

"*" indicates required fields

Address Information

Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16

Contact Us

"*" indicates required fields

Address Information

114a Cromwell Road,
Kensington,
London SW7 4ES

Contact Us

"*" indicates required fields

Address Information

c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam

Phones
Contact Us

"*" indicates required fields

Address Information

Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium

Contact Us

"*" indicates required fields

Address Information

Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup

Contact Us

"*" indicates required fields

Address Information

Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden

Contact Us

"*" indicates required fields

Address Information

Wilbecker Strasse 18,
D-40699 Erkrath
Germany

Contact Us

"*" indicates required fields

Address Information

C/O J09 Lonza, Lonzastrasse 2,

CH-3930, Visp, Switzerland

Contact Us