- Installation of 5no. sets of IPBS each 370 metres long
- Installation of 5no. step up transformers 515MVA each
- Installation of 20no. auxiliary transformers
- Installation of 5no. station service transformers 34MVA each
- Installation of generator circuit breaker
- Installation of MV and LV switchgear modular containerised units
- Installation of ladder and cable tray
- Installation of 400KV lead sheathed cable and end termination support structures into the national grid switchyard
- Installation and termination of 1.2 million metres of cables for electrical, instrument and control and CCTV
- Installation of 5no. standby diesel generators
- Installation of DCS racks
- Installation of acoustic enclosure equipment
- DC battery rack systems
- Earthing cabling and termination
- 25,000 signal loop checks
|