Dublin to Athlone Gas Pipeline

Client:Bord Gais - Sicim - Roadbridge
Country:Ireland
Completed:2002
Programme:February 2001 - December 2002
Project Description:
Electrical, Instrumentation, Civil and Mechanical Works associated with the formation of 6no. AGI's (Above Ground Installations) comprising of a fenced off 30m spread to receive gas from the 30" main pipe line supplied at 82 bar reducing to 3 bar for future supply to domestic and industrial end users.
Scope of Works:

Mechanical:
Installation and commissioning works carried out on the AGI sites including fabricating the high and low pressure above/below ground pipework connections to pre-packaged boiler and pressure reduction units. It also involved hydrostatic testing and drying in accordance with IE328: Code or Practice for Transmission Pipelines and Installations.

Electrical:
Installation and Commissioning works carried out on the AGI sites included all electrical and instrumentation to pre-packaged boilers and pressure reduction units and injection systems for a Sour Gas Odour System.

Civil:
Installation works carried out on the AGI sites included stripping back of top soil, pile driving, excavations, foundations fencing and finishing works as per the clients requirements.