Dublin to Athlone Gas Pipeline

| Client: | Bord Gais - Sicim - Roadbridge |
|---|
| Country: | Ireland |
|---|
| Completed: | 2002 |
|---|
| Programme: | February 2001 - December 2002 |
|---|
| Project Description: |
|---|
| Electrical, Instrumentation, Civil and Mechanical Works associated with the formation of 6no. AGI's (Above Ground Installations) comprising of a fenced off 30m spread to receive gas from the 30" main pipe line supplied at 82 bar reducing to 3 bar for future supply to domestic and industrial end users. |
| Scope of Works: |
|---|
Mechanical: Installation and commissioning works carried out on the AGI sites including fabricating the high and low pressure above/below ground pipework connections to pre-packaged boiler and pressure reduction units. It also involved hydrostatic testing and drying in accordance with IE328: Code or Practice for Transmission Pipelines and Installations.
Electrical: Installation and Commissioning works carried out on the AGI sites included all electrical and instrumentation to pre-packaged boilers and pressure reduction units and injection systems for a Sour Gas Odour System.
Civil: Installation works carried out on the AGI sites included stripping back of top soil, pile driving, excavations, foundations fencing and finishing works as per the clients requirements. |