Electrical, instrumentation and HVAC installation on the 450MW combined cycle gas turbine power station at Whitegate, Midleton in County Cork.
Electrical responsibilities
- Assembly and installation of the main generator step-up and unit auxiliary transformers
- Installation of all main and sub main distribution transformers & switchgear
- Stand-by generator, generator circuit breaker
- Installation and testing of all MV and LV cabling
- Cable racks installation within buildings and cable galleries and ducts between buildings
- Installation of the IPB bus duct linking the generator circuit breaker to the GSU and UAT transformers
- DCS and instrumentation cabling and terminations
- Fire alarm
- Lightning protection
- Communications
- Earthing
- Instrument hook-ups
- Public address system
- Security systems installation
- Testing, loop checking and commissioning support
Mechanical responsibilities
- Supply & installation of ductwork, fans, louvers and air conditioning