Ticona uses advanced polymer technology to produce high performance plastic materials for a wide spectrum of applications – from children’s toys to automotive components. Dornan was contracted to undertake the electrical instrumentation and HVAC installation in relocating the plant from the Kelsterbach to the Höchst industrial site in Frankfurt.
Responsibilities included
- Remote control units and safety switches
- Emergency stops
- Cable and terminations
- Instrument junction boxes
- DCS panels, fibre optic and marshalling panels
- Free issue MV & LV
- Switchgear, transformers, busbars
- Transit frames and sockets
- Cable tray and ancillaries
- Lighting
- Earthing cable and terminations
- Electrical heat tracing
- Video system
- Electrical pre-commissioning testing of motors
- HVAC installation