Dornan won three separate contracts for work on replacing Blast Furnace 4 at Port Talbot. We were one of the largest contractors on the project, operating on a 24/7 basis, with as many as 285 personnel on site and 200,000 man-hours completed.
Works included
- c 15,000m of primary containment
- MV installations
- In-air monitoring system
- Clear call system
- Hazard warning system
- Instrumentation, cabling and junction boxes installation
- Local control stations and safety switches
- Electrical cabling terminations
- Lighting & small power installation
- Earthing supply, cabling and terminations
- Electrical heat tracing
- Electrical pre‐commissioning motor testing