The Inchincoosh windfarm is an extension of the Kilgarven windfarm and produces 32.5MW of green energy. Dornan was commissioned to install the substation and switchyard equipment.
Responsibilities included
- Civil design for substation & compound
- Electrical design for substation & compound
- MV collector system
- MV link and bypass to existing substation
- Civil construction of substation & compound
- 20KV switchgear
- 50MVA transformer 20KV/110KV