To meet growing demand for its Ellipta inhaler, GSK needed a new three-floor manufacturing facility alongside its existing facility at Ware in Hertfordshire. The new 4500ft2 facility has nearly doubled production capacity, with around 95% of output for export. Dornan completed a range of instrumentation and electrical works.

Instrumentation responsibilities included

  • Junctions boxes, local panels and analyser panels installation
  • Cable trays installation
  • Instrument multi-cables laying and connection
  • Instrument cabinets installation
  • Calibration, tests and loop checks

Electrical responsibilities included installation of

  • Lighting system
  • Telephone system
  • Cable trays
  • Cables and connections
  • Electrical heat tracing system