In January 2014 Dornan began works on a new project for Deutsche Bank, encompassing mechanical and electrical installations on seven floors, including a new reception, with plant room and switch room upgrades.
Mechanical scope included
- Ventilation AC systems with Daikin VRV system
- 165KW gas-fired AHU
- Rainwater recovery system
- Fire hose reel protection system, including FHR booster
- 2500L water tank
- Mechanical car park ventilation system
- Cold water storage system
- BMS control system
Electrical works included
- LV switchgear and associated sub‐boards
- Call refuge system
- Disabled toilet alarm
- Fire detection system
- Access control system
- Installation of 40kVa life safety generator
- Installation of new VAV units
- Upgrading of existing BMS system
- Toilet facilities