Navigation

Bedfont Lakes, Middlesex

The Bedfont Lakes project was a new-build office complex set in a 72-hectare country park and nature reserve near Heathrow. Dornan completed a full range of mechanical and electrical fit-out services.

Electrical scope included

  • LV distribution
  • General lighting
  • General LV power
  • Emergency lighting
  • Telecommunications
  • Access control, surveillance & alarm systems
  • Fire detection and alarm
  • Earthing and bonding
  • EMC and screening
  • Automatic controls systems
  • Wiring for mechanical systems
  • Control panels
  • Lifts

Mechanical scope included

  • Incoming water main quality analysis
  • Capacity and earthing characteristics survey of electrical supply
  • Condition survey of existing MEP systems and utilities
  • Strip-out works
  • Rainwater pipework
  • Foul drainage above ground
  • Cold and hot water
  • Natural gas
  • Gas fired boilers
  • Low temperature hot water heating
  • Variable refrigerant flow system
  • General supply and extract systems