Dornan completed mechanical engineering works in a number of the hospital’s facilities, including the histocompatibility & immunogenetics and radiology departments, and the outpatients wing. The work was carried out alongside operational areas and integrated into existing live systems.
Works included
- LPHW, water services and medical gases pipework systems were upgraded and rerouted to suit the new layout
- Existing boilers and air handling equipment upgraded and replaced
- Ductwork routes and sizes altered to accommodate the revised layout and operational requirements
- Supply and installation of bedhead trunking and medical gases
- Supervision of all alterations to the existing building management system
- All services installed, tested and commissioned to HTM Standards