Whitegate IPP Powerstation

Client:Bord Gáis/Gama Power
Country:Ireland
Completed:Projected May 2010
Programme:February 2009 - May 2010
Project Description:
Electrical, Instrumentation and HVAC Installation on the 450MW Combine Cycle Gas Turbine Powerstation located at Whitegate, Midleton, Co. Cork.
Scope of Works:

Electrical:

  • Assembly and installation of the main Generator Set-Up (GSU) and Unit Auxillary Transformers (UAT)
  • Installation of all main and sub main distribution transformers & switchgear
  • Stand by generator, generator circuit breaker
  • Installation and testing of all MV and LV cabling
  • Cable racks installation located within buildings and within cable galleries and ducts between buildings
  • Installation of the IPB bus duct which links the generator circuit breaker to the GSU and UAT transformers
  • DCS and instrumentation cabling and terminations
  • General Services
  • Fire alarm
  • Lightning protection
  • Communications
  • Earthing
  • Instrument hook ups
  • Public address
  • Security systems installation
  • Testing, loop checking and commissioning assistance

Mechanical:

  • Supply & installation of ductwork, fans, louvers and air conditioning within the plant