Whitegate IPP Powerstation

| Client: | Bord Gáis/Gama Power |
|---|
| Country: | Ireland |
|---|
| Completed: | Projected May 2010 |
|---|
| Programme: | February 2009 - May 2010 |
|---|
| Project Description: |
|---|
| Electrical, Instrumentation and HVAC Installation on the 450MW Combine Cycle Gas Turbine Powerstation located at Whitegate, Midleton, Co. Cork.
|
| Scope of Works: |
|---|
Electrical:
- Assembly and installation of the main Generator Set-Up (GSU) and Unit Auxillary Transformers (UAT)
- Installation of all main and sub main distribution transformers & switchgear
- Stand by generator, generator circuit breaker
- Installation and testing of all MV and LV cabling
- Cable racks installation located within buildings and within cable galleries and ducts between buildings
- Installation of the IPB bus duct which links the generator circuit breaker to the GSU and UAT transformers
- DCS and instrumentation cabling and terminations
- General Services
- Fire alarm
- Lightning protection
- Communications
- Earthing
- Instrument hook ups
- Public address
- Security systems installation
- Testing, loop checking and commissioning assistance
Mechanical:
- Supply & installation of ductwork, fans, louvers and air conditioning within the plant
|
Back to Home