Telecity Stockholm

Client:Telecity
Country:Sweden
Completed:2009
Programme:November 2008 - April 2009
Project Description:
Design and build a Tier 3 Data Centre for Telecity located in Stockholm, Sweden. Phase 1 consisted of a 400m2 data hall providing a cooling capacity of 1500W/m2. Phase 1A consisted of a 2MV upgrade to design & build a supplementary 233m2 Co-Location Data Hall providing 658W/m2.
Scope of Works:
  • Specify, procure and install all M&E plant & equipment required for the Tier 3 Data Halls including Downflow units, 2MV Gensets, 1100KW chillers, 3200A busbar, LV boards, 2MV transformers, Static transfer switches and UPS systems etc.
  • Provide detailed SPOF analysis and discrimination studies
  • Manage and co-ordinate a commissioning team to oversee full IST testing including Heat load, black building and fall over scenarios

Back to Home
Tel: +353 21 233 0900  |  E-mail: recruitment@dornan.ie  |  Web Access Email
Company Registration Number: 212757
Copyright © 2000 - 2010 Dornan Engineering Limited
Powered by Dotser