- Procurement of distribution equipment, lighting, general services and control equipment
- Extension to existing MV distribution, including the installation of an additional MV/LV transformer & switchgear
- Lighting installation including all standard & emergency lighting systems
- Fire alarm installation including safe & hazardous areas as well as linear heat detection
- Installation of primary & secondary cable containment system including high grade stainless steel in process finishing areas
- Specification checks and calibration of all instrumentation
- Installation of control panels and field mounted junction boxes including remote I/O and DCS panels
- Loop check and commissioning 1100 I/O points
- Commissioning support
|