Pfizer Kilo Project

Client:Pfizer
Country:Ireland
Completed:December 2006
Programme:April 2006 - December 2006
Project Description:
Electrical & Instrumentation installation to the new build extension to the existing SYN 1 Process Facility. The build and installation was over three floors with an overall floor area of approx 1,750 sqm
Scope of Works:
  • Procurement of distribution equipment, lighting, general services and control equipment
  • Extension to existing MV distribution, including the installation of an additional MV/LV transformer & switchgear
  • Lighting installation including all standard & emergency lighting systems
  • Fire alarm installation including safe & hazardous areas as well as linear heat detection
  • Installation of primary & secondary cable containment system including high grade stainless steel in process finishing areas
  • Specification checks and calibration of all instrumentation
  • Installation of control panels and field mounted junction boxes including remote I/O and DCS panels
  • Loop check and commissioning 1100 I/O points
  • Commissioning support