GSK Project Everest

Client:GlaxoSmithKline
Country:UK
Programme:9 months
Project Description:
Mechanical, HVAC & Electrical Installtion to the new bottle production plant for GSK, Coleford
Scope of Works:

Mechanical:

  • HVAC Air Handling Units & associated ducting systems including a very low RH air supply to the moulding heads on the bottle moulding machines
  • Installation of Steam & Condensate pipework linking into an existing steam boilerhouse, soon to be linked to a new CHP Plant
  • Installation of CHW pipework and Condenser pipework for Adsorption chillers to Hybrid Cooling Towers
  • Installation of LPHW pipework from a steam to LPHW heat exchanger
  • Domestic Water Piperwork
  • Air Conditioning system to the offices and lab
  • Installation of Building Management System and instrumentation
  • Air & waterside commissioning of the above systems. Commissioning and controlled handover of the systems in a phased manner as production equipment is installed and brought on line

Electrical

  • Install Main LV Boards
  • Install Mains Cables from the HT transformers to the LV Boards
  • Install Sub Distribution Boards and all Cabling from LV Boards
  • Install all power cabling to HVAC Plant
  • Install all small power
  • Install LV Power to moulding plant
  • Install all data cabling and data installation
  • Install fire alarm and interface with the existing factory alarm, HVAC controls and moulding machines and conveyor systems
  • The earthing installation
  • The lightning protection installation
  • Security System

 